Torrance Memorial Medical Center

Miami, FL

The New Patient Tower at Torrance Memorial Medical Center consists of a seven story, $316 million dollar state of the art facility, encompassing 390,000 square feet, and featuring the latest in medical technologies and a modern design.  The Tower will provide 256 private rooms and 18 surgical and interventional treatment rooms, as well as a basement with a central utility plant and a tunnel connecting the existing hospital to the new Tower.  Craig Leach, President and CEO of Torrance Memorial Medical Center, stated that once completed, “the Tower will be unmatched locally in its energy and environmental design efficiencies. It will truly be a beacon for wellness and sustainability.”

Architect:
HMC
San Diego, California

General Contractor:
McCarthy Building Companies, Inc.
Newport Beach, California

Subcontractor:
Saddleback, Waterproofing
Laguna Hills, California

Torrance Memorial Medical Center incorporates the following Polyguard Products:

Waterproofing Systems

650 Sheet Membrane – 60-mil, post-concrete pour waterproofing membrane/vapor retarder

Underseal® Underslab Membrane – 85 mil pre-concrete pour waterproofing membrane/vapor barrier that provides a continuous seal

Alta Dadeland (Mixed Use) incorporates the following Polyguard Products:

Polyflow® 15 / 15P – Prefabricated geocomposite vertical use drainboard with a compressive strength of 15,000 psf

System Accessories

606 Tape – High strength double-sided tape comprised of rubberized asphalt

California Sealant – Used to prime structural surfaces on which waterproofing membranes will be applied

LM-85 SSL – Self leveling flood coat waterproofing membrane

LM-95 – Two-component fast cure urethane waterproofing membrane

Underseal® Fabric Tape – Use around pipe penetrations and at end laps for patching damaged areas of the membrane

Contact Us

We're not around right now. But you can send us an email and we'll get back to you, asap.

Not readable? Change text.

Start typing and press Enter to search